How to build a handyman price list from your own hourly floor: the example price for each common job, the minutes each can take before you drop under the floor, and the jobs that need care in older homes.

HandyPilot6 min read

Handyman Prices for Common Jobs: TV Mounting, Drywall, Assembly and More
In this article

Build your price list from your hourly floor, one job at a time: divide each price by your floor to see how many minutes the job can take before you are working below it. In our example the floor is $86.25 an hour, so a $129 TV mount has 90 minutes. We do not publish a national "typical price" for each job, because we could not find one from a government source, and an average from a website tells you nothing about your costs. The prices below are the example prices used in all our guides: replace each one with a price from your own numbers.

This guide is for the United States. All dollar figures are round example numbers and assumptions. Nothing here is legal or tax advice.

Where does the floor come from?

From your costs and your billable hours, as the guide on how much to charge as a handyman shows step by step. The short version, with example numbers: $75,000 a year to take home plus $15,000 of costs needs $103,500 in sales. Only 25 of 40 working hours are billable, 1,200 hours over 48 weeks. So $103,500 / 1,200 = $86.25 an hour. Compare it with an employee's pay: the Bureau of Labor Statistics shows Maintenance and Repair Workers, General at a median hourly wage of $22.45 in May 2023. That is a different job, with no truck, insurance or unpaid driving, so use it as a reminder and not as a rate.

What is the example price list?

These are the prices from the calculator on a HandyPilot site, all example numbers. The last column is arithmetic: price / $86.25 x 60 minutes. It tells you how long the job can take, including the drive and set-up you carry, before you are under the floor.

Job Example price Minutes before you pass the floor
First hour of a visit $125 87
Each extra hour $85 59
TV mount, first TV $129 90
TV mount, each extra TV $99 69
Hide the wires in the wall $120 83
Soundbar mount $60 42
Drywall patch, first $150 104
Drywall patch, each extra $60 42
Texture match $75 52
Paint touch-up $85 59
Furniture assembly, first piece $90 63
Furniture assembly, each extra piece $55 38
Door repair or install, first $150 104
Door repair or install, each extra $95 66
Light fixture, first $135 94
Light fixture, each extra $85 59
Half day (4 hours) $340 237
Full day (8 hours) $640 445

Read the full-day row: 445 minutes is 7.4 hours, under the 8 hours it takes. That is the $50 gap our rate guide flags: a full day at $640 is under the floor by $50 (8 x $86.25 = $690), and it works only when the day has almost no unpaid driving.

How do you turn this into your own list?

  1. Time your ten most common jobs for a month. Write the minutes from the moment you park to the moment you leave, and the drive in a separate column.
  2. Divide. Your price should be at least the minutes you really spend (job plus its share of the drive and set-up) x your floor per minute. The floor per minute is $86.25 / 60 = $1.4375.
  3. Round up to a clean number: $129, not $117.
  4. Price repeats lower than the first. The first unit carries the drive and set-up, and each extra one does not. That is why the example second TV is $99 and the first $129.
  5. List the add-ons customers ask about most, and give each its own price.
  6. Set a minimum equal to your first hour, so nothing under an hour costs less.

A worked row. Say you time a TV mount at 50 minutes on site, and you add 35 minutes for the drive and set-up. That is 85 minutes, or 1.417 hours. At the floor that is 1.417 x $86.25 = $122.19. Round up to $129, which leaves $6.81 above the floor on that job. If your jobs take 70 minutes on site, the same price falls under the floor, so check each row against your own times. (These times are assumptions to show the sum.)

Which jobs need care before you publish a price?

Price by what the job can hide, not only by what you see.

What about materials, pickup and haul-away?

State them separately and write them on the list. In our example: materials pickup is $45, haul-away is $60 and a same-day visit is $75. Each is also arithmetic against the floor: $45 is 31 minutes, $60 is 42 minutes and $75 is 52 minutes. A parts run is time nobody pays for unless you charge for it. Materials themselves are cost plus a markup you state, for example 15 percent, or supplied by the customer.

Show the prices, not "call for a quote"

A homeowner comparing handymen on a phone at night sees a price or sees "call for a free estimate". A page with a starting price for each job lets the visitor book instead of compare. A handyman website with a page for each job on this list, and the handyman cost calculator, show how the prices look to a visitor. Prices on the page also decide what you have to answer on the phone, so see how to write handyman estimates.

How often should you review the list?

Every January and July, look at your last 50 jobs. If one job type keeps running over the minutes you priced, raise it. If you win nearly every quote for one job, you may be too cheap on it. Drop the jobs you dislike by pricing them high or removing them from the list. To check your market, call two or three local handymen and ask for a price on one job, then compare with your floor, not with theirs.

Frequently asked questions

How much does a handyman charge to mount a TV?

It depends on your costs and market. In the guide example the first TV is $129 and each extra TV is $99, and $129 leaves 90 minutes at an $86.25 floor. Wires hidden in the wall are $120 more. Build yours from your own floor.

How much does a handyman charge for drywall repair?

In the guide example, $150 for the first patch and $60 for each extra patch, with texture match $75 and paint touch-up $85. In a home built before 1978 check the EPA lead-safe rule first.

Should I charge per task or per hour?

Per task for jobs you do often and have timed, like TV mounts. Per hour, with a range, for lists of small fixes and for jobs you cannot see before you arrive.

How do I know a price is high enough?

Divide it by your hourly floor and multiply by 60. That is the number of minutes the job can take, including driving and set-up, before you work below the floor.